Important Messages:

The Railroad Commission of Texas will hold an open meeting at 9:30 a.m. on November 17, 2026, in Room 1-111, First Floor of the William B. Travis Building in Austin. To view the webcast, visit the AdminMonitor website at https://www.adminmonitor.com/tx/rrc/open_meeting/20261117/.

Texas.Gov Payments General Maintenance
 
Notice to Operators: RRC Online Payments will be intermittently unavailable November 22, 2026, from 10:00 PM to 10:30 PM CT.  During this time, customers using RRC applications will be unable to process online payments through Texas.gov payment services and will be redirected to a maintenance page and unable to complete payments until after the maintenance is complete.  

Proposed Rule Amendments: §§ 3.15 and 3.58

The proposed amendments to rules §§ 3.15 and 3.58, related to Senate Bill 1150 (89th Legislative Session, 2025), have been posted for public comment. For more information, including an online comment form, please visit the RRC Proposed Rules page.

The RRC will host a hybrid public hearing to receive verbal comments, beginning at 10 a.m., on Friday, November 20, 2026. For more information, please visit the RRC's Public hearing announcement.

Annual Pressure Test Condition

DESCRIPTION:

The Annual mechanical integrity test (MIT) is required whenever a well is completed without surface casing set and cemented through the entire zone of usable quality groundwater in accordance with the requirements of Statewide Rule 13.

EXAMPLES:

  1. an existing well that was drilled with 500 feet of surface casing, but the GAU currently recommends 550 feet of surface casing,
  2. an existing well that was drilled with 500 feet of surface casing, and the GAU currently recommends 500 feet of surface casing, but either the cement did not circulate to ground surface or did not meet the Rule 13 quality standard,
  3. an existing well that was drilled with production casing cemented from total depth to ground surface as a single-string completion (without any surface casing), and
  4. an existing well that was required to increase test frequency as a condition of a workover approval, or variance from other construction or operating standards. 