T-4 Pipeline Permit Miles as of June 29, 2018

The number of permitted miles assigned to each operator in RRC records on June 29, 2018 will be the number used in the online payment portal to calculate the mileage fee that each operator must pay by August 31, 2018.

To calculate the mileage fee, the RRC will categorize pipeline operators into two groups.

  • Group A (Regulated = Yes) includes transmission and gathering pipelines that are required by RRC rules to have a valid T-4 permit to operate and are subject to the regulations in 49 Code of Federal Regulations (CFR) Parts 192 and 195. Group A pipelines include natural gas transmission and storage pipelines, natural gas gathering pipelines, hazardous liquids transmission and storage pipelines, and hazardous liquids gathering pipelines.
  • Group B (Regulated = No) includes gathering pipelines that are required by RRC rules to have a valid T-4 permit to operate but are not subject to the regulations in 49 CFR Parts 192 and 195. Group B pipelines include intrastate production and gathering pipelines leaving a lease.

To view a chart showing the number of permitted miles by operator, visit the RRC website.

Last Updated: 7/12/2018 1:30:15 PM