Capitol Complex Construction

If you are planning to visit the Railroad Commission’s Austin offices in the William B. Travis state office building, please be aware of changes to traffic patterns and the availability of metered parking in the area due to the Capitol Complex Construction project.  Click here for additional information.

Proposed Form Amendments

This page lists proposed changes to Railroad Commission of Texas forms that are currently under consideration. 
For each revision, the table below will provide:

  1. a link to the current version of the form;
  2. a link to the proposed form as amended;
  3. a synopsis of the proposed changes; and
  4. the status of the proposed amendment:
    1. Considered – a proposed amendment under consideration by staff but not yet brought forward for consideration by the Commission;
    2. Proposed – a proposed amendment that has been presented to the Commission for consideration; or
    3. Adopted – a proposed amendment that has been approved by the Commission for adoption.


Oil & Gas Proposed Form Amendments


You may provide comments on any Oil & Gas form amendments under consideration, using the Oil & Gas online comment form.

Form Number Form Title Current Version Proposed Version Summary of Changes Status Comment Deadline Comments
W-10 Oil Well Status Report Form

Instructions
Form

Instructions

Form - Reflect proposed rule changes to 16 TAC §3.52 and §3.53

Instructions - Include Status title on existing columns.
Proposed  8/1/18   

Oversight & Safety Division Proposed Form Amendments

You may provide comments on any Oversight & Safety form amendments under consideration, using the Oversight & Safety online comment form.

Form Number Form Title Current Version Proposed Version Summary of Changes Status Comment Deadline Comments
GUA 7.351 Gas Utility Tax Report GUA 7.351 GUA 7.351-proposed Account 777 has been removed

Account 813 has replaced 824
Adopted 2/28/2018  Revised Form
  Customer Notice of Interim Rate Adjustment (aka GRIP) N/A IRA Notice Proposed

IRA Notice Proposed Instructions
  Adopted 2/28/2018 New Form
  Interim Rate Adjustment Application (aka GRIP) Interim Cost Recovery and Rate Adjustment Report IRA Proposed Form Spreadsheet Summary of Changes Adopted 2/28/2018   Revised Form
  Public Notice of Proposed Rate Increase   SOI-Notice-Form-Proposed


SOI Notice Form Proposed Instructions
  Adopted 2/28/2018 New Form

Last Updated: 6/8/2018 9:51:29 AM